Quantity Available :
Condition : Brand New
For Special Preparation and Dispensing Sealants and Filling Joints, Heated to a Temperature of 180 C. Crack Sealing Machine.
Boiler
Effective Amount of the Material Prepared About 350L. Thermail Oil Heated Furnace, Mass is Heated Over the Entire Surface of the Walls of the Boiler. Capacity Between the Walls of the Thermal Oil Boiler 190L. Distribution of Thermal Oil Pump. Hard Mass Bloick are Placed on the Initial Grid (Where They Are Preheated and Divided). Hard Mass Blocks Divided into Pieces, which Crossed the Pre-heated Initial Grif, are Easier to Melt. Hydraulic Horizontal Mixer, Kubota Diesel Engine with Hydraulic Pump.
Oil Heating System
Automatically Controlled Heating System with an Oil Burner, Pipe Heated by Heating Oil Burner Heats the Thermal Oil is Located Between the Walls of the Boiler, Which Protects Against Overheating of the Material Heated Spot, Manul Gas Burner with Holder for Gas Cylinders.
Pouring Grout Installation
Complete with Pump, Hydraulic Drive, Compressor with a Capacity of 80 l/min, Pouring Tube, Nozzle, Regulating Valve, Special Hose with a Length of 4m.
Tank for Fuel Oil/Diesel with a Capacity of 60L